Susanti, I. I., & Rimawan, F. (2021). Cost and Time Analysis of the Acceleration Earthworks with the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project. Quantitative Economics and Management Studies, 2(6), 345–354. https://doi.org/10.35877/454RI.qems324