The Trigger for Improving the Performance of Construction Management Consultants PT Hariara Bona Perkasa (PT. HBP)

Abstract
Construction Management Supervisory Consultant is a business entity or individual that has a function as a supervisor in a development project. The criteria for good or poor performance results are based on the suitability of the quality plan, budget, time and fulfillment of other company performance based on the contract that has been received, as well as the Conditional Work Plan (RKS) and the Framework of Reference (KAK). This study aims to explore the main triggering factors that cause the improvement of PT. HBP in supervisory work. This study uses a quantitative method, using the results of the t-test which is processed using the structural equation model (SEM) and the SPSS program. The results showed that there was a significant and positive influence between leadership, schedule management and risk management which was included in resources & capabilities and Project Management Competencies. The results of the research analysis show that the main factor that triggers the improvement of the company's performance of PT. HBP is risk management with a one-sample T-statistic value of 2,215 followed by leadership 1,890 and Schedule Management 1,179. Therefore, in this study, it can be concluded that risk management, leadership and schedule management are the main factors that trigger the improvement of PT. HBP.
References
Abraham, S.E., Karns, L.A., Shaw, K., Mena, M.A., 2001. Managerial competencies and the managerial performance appraisal process. The Journal of Management Development 20 (10), 842–852.
Ahadzie, D.K., 2007. A model for predicting the performance of project managers in mass house building projects in Ghana, PhD thesis, University of Wolverhampton.
Ahadzie, D.K., Proverbs, D.G., Olomolaiye, P., 2008. Towards developing competency-based measures for construction project managers: should contextual performance behaviors be distinguished from task performance behaviors? International Journal of Project Management 26 (1), 631–645.
Chin, W. W. (1998). The Partial Least Squares Aproach to Structural Equation Modeling. Modern Methods for Business Research, 295, 336
D. M. T. Sihombing, Pertanggung Jawaban Hukum Pihak Kontraktor Dalam Menghadapi Kegagalan Konstruksi (Menurut UU No. 2 Tahun 2017), Universitas HKBP Nommensen, 2019.
F. Tomigolung, M. D. J. Sumajouw, and H. Tarore,. Analisis Kinerja Konsultan Pengawas Pada Proyek Jalan Dan Jembatan Di Sulawesi Utara, J. Ilm. MEDIA Eng., vol. 3, no. 2, pp. 79–83.
Ghozali, I. (2016) Aplikasi Analisis Multivariete Dengan Program IBM SPSS 23. Edisi 8. Semarang: Badan Penerbit Universitas Diponegoro.
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43(1), 115-135.
Isik, Z., Arditi, D., Dikmen, I., & Birgonul, M. T. (2010). Impact of Resources and Strategies on Construction Company Performance. Journal of Management in Engineering, 26(1), 9–18.
Kangari, R. 1995. Risk Management Perceptions And Trends Of U.S. Construction. J. Constr. Eng. Manage., 1214, 422–429.
Peraturan Menteri Pekerjaan Umum No: 06/PRT/M/2008 tentang Pedoman Pengawasan Penyelenggaraan Pekerjaan Konstruksi. Departemen Pekerjaan Umum. Jakarta
Peraturan Menteri Pekerjaan Umum No: 08/PRT/M/2011 tentang Pembagian Subklasifikasi dan Subkualifikasi Usaha Jasa Konstruksi. Kementrian Pekerjaan Umum Republik Indonesia.
Ringen, K., Seegal, J., and Englund, A. 1995. Safety And Health In The Construction Industry. Annu. Rev. Public Health, 16, 165–188.
S. Aziz, E. H. D. Putranto, and H. Yunianto, Analisis Faktor-Faktor Kinerja Konsultan Pengawas Yang Berpengaruh Terhadap Waktu dan Mutu Pekerjaan Proyek Peningkatan Jalan di Kabupaten Probolinggo, J. Info Manaj. Proy., vol. 7.2, no. September, pp. 38–49, 2016.
S. Rauf, Peranan Konsultan Pengawas Dalam Pengendalian Mutu Pada Pekerjaan Konstruksi Gedung Di Kota Gorontalo, Universitas Negeri Gorontalo, 2016.
Soeharto, I, (2001), Manajemen Proyek Dari Konseptual Sampai Operasional, Erlangga, Jakarta
Sugiyono. 2013. Metodelogi Penelitian Kuantitatif, Kualitatif Dan R&D. Bandung (ID): ALFABETA.
Turner, R.J. (1993). The Handbook of Project-Based Management. London: McGraw-Hill Companies.
Warszawski, A. 1996. Strategic Planning In Construction Companies. J. Constr. Eng. Manage., 1222, 133–140.
Henseler, J., Ringle, C. M., & Sarstedt, M. (2015). A new criterion for assessing discriminant validity in variance-based structural equation modeling. Journal of the Academy of Marketing Science, 43(1), 115-135. https://doi.org/10.1007/s11747-014-0403-8
Copyright (c) 2024 Stefan Gokparulian, Wita Juwita Ermawati, Furqon Syarief Hidayatulloh

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.